Experience in factory renovation – expansion without interrupting production and practical projects of DELCO

With many years of experience in factory renovation, repair, and upgrading, DELCO, a Design & Build contractor, has supported numerous FDI manufacturers in upgrading and expanding their facilities under constrained site conditions, tight schedules, and strict safety requirements.

Construction solutions to avoid production disruption

Renovating or expanding a factory while maintaining full production is one of the biggest challenges in industrial construction: limited construction space, high equipment and manpower density, and strict noise–dust–vibration control requirements to avoid impacting ongoing production. These conditions require scientific site management and extensive practical experience.

Based on hands-on experience, DELCO has developed a set of construction solutions to ensure uninterrupted production, focusing on key factors such as:

  • Detailed construction planning tailored to the actual conditions of each factory area.
  • Optimized site layout and internal traffic planning, ensuring clear separation between construction zones and operational areas.

Construction solutions for factory renovation and upgrade by DELCO

  • Noise – dust – vibration control through practical measures such as installing barriers, using tarpaulins, spraying water, etc., to ensure production lines remain unaffected.
Safety shielding during factory renovationSafety measures for factory renovation work

Protection measures and safety barriers in the fit-out and upgrade project for an auto parts factory in Hai Phong.

  • Carefully scheduling noisy work or tasks that require power/water shutdown during appropriate time slots to minimize disruption to production.

Nighttime construction at the factory renovation project

DELCO conducted nighttime construction for the renovation and upgrade of an automobile factory in Pho Noi B Textile and Garment Industrial Park, Hung Yen.

  • Real-time progress tracking using digital tools to coordinate manpower and materials accurately
  • Strict safety management and close on-site supervision to maintain construction quality and minimize risks.

Top 5 typical factory renovation and expansion projects by DELCO

1. Renovation of the factory floor at DORCO Vina, Hung Yen

Factory floor renovation at Dorco Vina – typical factory renovation project

The floor settlement renovation project, covering an area of nearly 14,000 m² and including the construction of a two-storey parking structure within the premises of an operating packaging printing factory, posed very high requirements in terms of technical solutions and construction management. DELCO developed an appropriate structural solution that met the stability requirements of the printing line, while also designing a foundation system separated from the workshop floor and using elastic materials at the separation joints to limit the impact of vibration and settlement. The entire construction process was tightly organized to ensure the schedule and to minimize any impact on the factory’s production activities during the renovation & repair of the workshop.

2. DOOSAN Electro-Materials factory

MEP project at Doosan Electro-Materials factoryMEP installation in operating Doosan factory

This MEP (Mechanical, Electrical, Plumbing) project was executed while the factory remained fully operational, with a tight timeline of only two months and very limited workspace. The biggest challenge was installing large-diameter pipes on an existing panel ceiling, intertwined with existing MEP systems. DELCO maintained strict safety and quality control to ensure precise, neat, and integrated installations.

3. Power Plus Technology factory – Phase 2

PPT Phase 2 workshop expansion

The Phase 2 expansion workshop was located adjacent to an active production area, where space constraints limited the use of large pile-driving equipment. DELCO selected a suitable structural solution that ensured both the safety of the new workshop and the structural integrity of the entire factory, maintaining long-term safety.

4. Channel Well Technology factory – Phase 2

Three-storey workshop expansion for Channel Well Technology

Expanding a three-storey workshop within the Phase 1 site posed challenges in lifting materials to higher floors. DELCO had to carefully plan construction methods and combine manual labor in several stages to maintain both quality and schedule without affecting the factory’s operations.

5. Renovation of ANNEX electronics factory

Renovation of ANNEX electronics component factory

This renovation was carried out while the electronics component factory was in full operation, requiring DELCO to strictly control space and scheduling to avoid disrupting production lines. Construction zones were clearly separated, with designated routes for material transportation and storage. Additionally, multi-layer dust and noise shielding systems were deployed to minimize environmental impact.

With extensive experience from past projects, DELCO always selects construction methods tailored to each factory’s specific conditions and applies strict control throughout the implementation process. The top priority is ensuring project timelines, construction quality, and uninterrupted operations for clients.