FACTORY CONSTRUCTION QUOTATION

FACTORY CONSTRUCTION QUOTATION

Commitment to no additional costs

We are committed to no additional costs beyond the planned budget for the design and construction of the factory’s M&E system

90+

Projects

70+

Solid partners

100+

Engineers

100+

Engineers

90+

Projects

70+

Solid partners

OUR COMMITMENT

With more than 15 years of experience as an industrial design-build contractor, DELCO always strives to build quality FDI factories and workshops in Vietnam. We are committed to:

.

100% no additional costs
Calculating a full and detailed quotation, the construction process does not incur costs compared to the plan.

.

Always accompany our clients
Always accompany and support our clients in every stage, even after the project warranty.

OUR COMMITMENT

With more than 15 years of experience as an industrial design-build contractor, DELCO always strives to build quality FDI factories and workshops in Vietnam. We are committed to:

.

100% no additional costs
Calculating a full and detailed quotation, the construction process does not incur costs compared to the plan.

.

Always accompany our clients
Always accompany and support our clients in every stage, even after the project warranty.

HIGH QUALITY GENERAL CONTRACTOR

HIGH QUALITY GENERAL CONTRACTOR

DELCO has many years of experience as a Design – Build Contractor for FDI factory projects, both in the field of Construction and Industrial M&E. We focus on durability, aesthetic suitability and functionality in the design and construction process. Important items are calculated in detail to ensure safety, stability and meet legal standards for each manufacturing industry.

DELCO uses a close and detailed tracking, control and cost estimation system, allowing us to estimate the project costs with 80-90% accuracy right from the early stages of the project, helping the investor select technical and material solutions in accordance with the financial situation and production plan of the factory.

 

PROACTIVE FINANCIAL PLANNING

A package quote helps the investors proactively plan their finances.

We survey and quote the design – build of the factory and industrial M&E in detail, helping the investor to have a suitable financial plan.

Get a quote

PROACTIVE FINANCIAL PLANNING

A package quote helps the investors proactively plan their finances.

We survey and quote the design – build of the factory and industrial M&E in detail, helping the investor to have a suitable financial plan.

Get a quote

FIELD OF ACTIVITIES

Steps to survey, consult and estimate factory construction cost

Factory construction costs will fluctuate greatly according to the requirements of technology solutions, industry specifics, material requirements, applicable standards, etc. We try to estimate an early cost for the investor to take an overall look and choose the most suitable design-build plan.

Steps to survey, consult and estimate factory construction cost

Factory construction costs will fluctuate greatly according to the requirements of technology solutions, industry specifics, material requirements, applicable standards, etc. We try to estimate an early cost for the investor to take an overall look and choose the most suitable design-build plan.

FREQUENTLY ASKED QUESTIONS

HOW LONG IS A FACTORY CONSTRUCTION QUOTATION VALID FOR?

A Factory construction quote usually has the same effect as bids, often specified in bids. Depending on the contractor, this period of validity can last from 30 days – up to 180 days. 

During periods of continuous price fluctuations in the building materials market, it is up to the bidders to propose different price quotes, or offer price adjustment terms.

The quotation and construction progress of the factory usually do not include the cost and time of applying for a permit (Fire Prevention Permit, Environmental Permit, Construction Permit…).
 

Besides the main factors such as design options, material solutions, the cost of building the factory will depend on progress requirements, machinery and equipment layout, technical requirements from the investor.

In addition, in recent years, there have been many changes in regulations and standards applied in plant design and construction such as QC06: 2022/BXD, Law on Environmental Protection 72/2020 with Decree 08/2022, QC01:2021/BXD on construction density, etc. that regulate in detail requirements for fire protection systems, building density, environmental protection systems and so on. Therefore, the cost of building a factory has great fluctuations among production industries or different production scales.