FACTORY CONSTRUCTION QUOTATION

FACTORY CONSTRUCTION QUOTATION

Commitment to no additional costs

We are committed to no additional costs beyond the planned budget for the design and construction of the factory’s M&E system

      90+

      Projects

      70+

      Solid partners

      100+

      Engineers

      100+

      Engineers

      90+

      Projects

      70+

      Solid partners

      bg tong thau xay dung cn page final

      OUR COMMITMENT

      With more than 15 years of experience as an industrial design-build contractor, DELCO always strives to build quality FDI factories and workshops in Vietnam. We are committed to:

      .

      100% no additional costs
      Calculating a full and detailed quotation, the construction process does not incur costs compared to the plan.

      .

      Always accompany our clients
      Always accompany and support our clients in every stage, even after the project warranty.
      ppt tong thau final

      OUR COMMITMENT

      With more than 15 years of experience as an industrial design-build contractor, DELCO always strives to build quality FDI factories and workshops in Vietnam. We are committed to:

      .

      100% no additional costs
      Calculating a full and detailed quotation, the construction process does not incur costs compared to the plan.

      .

      Always accompany our clients
      Always accompany and support our clients in every stage, even after the project warranty.

      HIGH QUALITY GENERAL CONTRACTOR

      HIGH QUALITY GENERAL CONTRACTOR

      DELCO has many years of experience as a Design – Build Contractor for FDI factory projects, both in the field of Construction and Industrial M&E. We focus on durability, aesthetic suitability and functionality in the design and construction process. Important items are calculated in detail to ensure safety, stability and meet legal standards for each manufacturing industry.

      DELCO uses a close and detailed tracking, control and cost estimation system, allowing us to estimate the project costs with 80-90% accuracy right from the early stages of the project, helping the investor select technical and material solutions in accordance with the financial situation and production plan of the factory.

       

      bao gia xay nha may 01
      bao gia xay nha may 02

      PROACTIVE FINANCIAL PLANNING

      A package quote helps the investors proactively plan their finances.

      We survey and quote the design – build of the factory and industrial M&E in detail, helping the investor to have a suitable financial plan.

      Get a quote

      PROACTIVE FINANCIAL PLANNING

      A package quote helps the investors proactively plan their finances.

      We survey and quote the design – build of the factory and industrial M&E in detail, helping the investor to have a suitable financial plan.

      Get a quote

      FIELD OF ACTIVITIES

      Steps to survey, consult and estimate factory construction cost

      Factory construction costs will fluctuate greatly according to the requirements of technology solutions, industry specifics, material requirements, applicable standards, etc. We try to estimate an early cost for the investor to take an overall look and choose the most suitable design-build plan.

      Steps to survey, consult and estimate factory construction cost

      Factory construction costs will fluctuate greatly according to the requirements of technology solutions, industry specifics, material requirements, applicable standards, etc. We try to estimate an early cost for the investor to take an overall look and choose the most suitable design-build plan.

      FREQUENTLY ASKED QUESTIONS

      HOW LONG IS A FACTORY CONSTRUCTION QUOTATION VALID FOR?

      A Factory construction quote usually has the same effect as bids, often specified in bids. Depending on the contractor, this period of validity can last from 30 days – up to 180 days. 

      During periods of continuous price fluctuations in the building materials market, it is up to the bidders to propose different price quotes, or offer price adjustment terms.

      The quotation and construction progress of the factory usually do not include the cost and time of applying for a permit (Fire Prevention Permit, Environmental Permit, Construction Permit…).
       

      Besides the main factors such as design options, material solutions, the cost of building the factory will depend on progress requirements, machinery and equipment layout, technical requirements from the investor.

      In addition, in recent years, there have been many changes in regulations and standards applied in plant design and construction such as QC06: 2022/BXD, Law on Environmental Protection 72/2020 with Decree 08/2022, QC01:2021/BXD on construction density, etc. that regulate in detail requirements for fire protection systems, building density, environmental protection systems and so on. Therefore, the cost of building a factory has great fluctuations among production industries or different production scales.

      cau hoi thuong gap bao gia nha may